david6-cyclist.bsky.social
👤 Joined on 17 November 2024
Followers
Following
Total Posts
@david6-cyclist.bsky.socialkoplee74.bsky.social
diegom824.bsky.social
lilpinkfrog.bsky.social
trangirlismo.bsky.social
fuzyjoe.bsky.social
creatinglightly.art
gentil.bsky.social
total2total.bsky.social
Not Found
motoringguru.bsky.social
pupalloro.bsky.social
shenanigansen.bsky.social
kasutama.bsky.social
Not Found
spiralien.bsky.social
adamcadmon1.bsky.social
chaillich.bsky.social
mischiefcats.bsky.social
imbigboo.bsky.social
shannonminter5.bsky.social
specr-cat.bsky.social
Not Found
Not Found
hatefulkate17.bsky.social
davidbeech.bsky.social
through March. The field has an 11 year lifespan by which time alternative power will be brought on line. However the oil field hasn’t been given the go ahead. I think that’s right. We don’t need more oil, but we do need more UK produced gas just to get by. It’s a strategic move and that matters.
Show PostUK APPROVES SWITCH ON OF ROSEBANK GAS FIELD I really don’t think there was any choice. It will not reduce prices but it will provide up to 6% of our gas supply and buffer a potential shortage in deep winter and forecasts suggest this El Niño will generate severe cold in the UK during February
Show Post4/ Structures are being prepared above production buildings for anti-drone nets. OSINT analysts also reported signs of about 42,000 square meters of underground production facilities in September.
Show Post3/ The defenses include concrete towers, platforms for Pantsir and Tor systems, and towers equipped with anti-aircraft machine guns.
Show Post